|
Work in Progress on Tunnel # 5
May 20, 2001
Click on logo at top to return to index page. |
|

East plug has been removed.
Please do not go here. This is a restricted
area. In addition the tunnel roof has not been stabilized. |

This work platform is on tractor belts and it moves with
the work area.
|
|

Close up of work platform. Note mesh going up to top of
picture. This will be tacked to ceiling. |

If you look closely you can see the bolts anchoring the mesh.
Mesh at right is being installed on roof from work platform. |
|
It is dark in the tunnel, and this is one of two light
stands. |

West tunnel plug, still in place. Top three holes
are for ventilation. Bottom hole is an access door. |